CAPP Project Information
Project Maps and Facilities
CVWD’s existing groundwater production wells would be used to extract the purified water back out of the groundwater basin for use in the drinking water supply.
- An Advanced Water Purification Facility
- 10-inch pipeline to deliver the purified water
- Two groundwater injection wells
- Two new monitoring clusters

Reports and Studies
Project Design and Engineering
Economic Benefit Analysis
Environmental Documents
Final Environmental Impact Report (EIR)Addendum No. 1 to EIRAddendum No. 1 - Mitigation Monitoring and Reporting ProgramFull CAPP Draft EIR and AppendicesCAPP Draft EIR Draft CAPP EIR AppendicesDraft CAPP EIR Executive SummaryNotice of Availability of Draft Environmental Impact Report and Notice of Public MeetingDraft CEQA Addendum No. 2_CAPP.pdfDraft CAPP Title 22 Engineering Report_No Appendices.pdf
